geelong - Wall panels going up

Our Geelong project is full steam ahead and below are pictures of the first wall panels going up.  

All full panels were delivered at the same time, which gave the fastest training start for our new builder Dale, and all slab edge cladding and base plates were installed, ready for the panels.

A narrow rear sideway on a rainy day presented a challenge, but Dale did a great job  - and within three days, all the lower panel runs were completed, and he'd prepared for the upper panels.

The window and door head panels complete the level, ready for the upper panels to extend the height of each pavilion to the designed volumes.

A simple pavilion design has allowed efficient installation for a fairly tight site access.